With the HVAC work at the high school having to be postponed, Superintendent Matt Vollman told the NCOE school board on Wednesday night that he is looking at getting some other projects done this summer. Vollman said he has been talking to the architect about the sidewalks, observing that someone in a wheelchair would have issues using them. An estimated $100,000 would be needed to repair the sidewalks. There are also concrete steps on the west side of the building with gaps in them, making the steps practically unusable.
Subscribe here to continue reading.