The Illinois Department of Transportation would like to alert motorists traveling on Interstate 64 near Grayville that there will be a lane closure on the bridges that carries I-64 over the Wabash River.
The closures are scheduled to begin on Monday, April 12, 2021 extending through Friday, April 16. The closure will be effective from 7:30 a.m. until 5:30 p.m. each day during these time periods.
Crews will be preforming the annual inspection of the structures carrying Interstate 64 over the Wabash River.
Emergency vehicles will be allowed through the construction site as quickly as possible.